Process

How a Stone Project Runs, Step by Step

From software and slab selection to templating, fabrication, installation and coordination.

6 steps

The Six Steps Behind Every Project

  1. 01

    StoneEx System software

    StoneEx System is the software Stoneex Surfaces uses for templating and coordination, so project details stay connected from start to finish.

  2. 02

    Material Selection

    You choose the material and the exact slab at a supplier showroom, and Stoneex Surfaces coordinates the details.

  3. 03

    Digital Templating

    We capture your space with laser measurement and turn it into a precise digital template.

  4. 04

    Fabrication

    Stoneex Surfaces' team sets the fabrication specs and checks quality, and you approve the layout before anything is cut.

  5. 05

    Installation

    Pieces are brought in, dry-fitted, leveled, set and finished, then we walk the result with you.

  6. 06

    Project Coordination

    Stoneex Surfaces is your single point of contact for everything stone-related, from slab reservation to install day.

Ready for step one? Tell us about your project

Share photos, rough sizes and the material you like. We will help you take the next step.