Process
How a Stone Project Runs, Step by Step
From software and slab selection to templating, fabrication, installation and coordination.
6 steps
The Six Steps Behind Every Project
- 01
StoneEx System software
StoneEx System is the software Stoneex Surfaces uses for templating and coordination, so project details stay connected from start to finish.
- 02
Material Selection
You choose the material and the exact slab at a supplier showroom, and Stoneex Surfaces coordinates the details.
- 03
Digital Templating
We capture your space with laser measurement and turn it into a precise digital template.
- 04
Fabrication
Stoneex Surfaces' team sets the fabrication specs and checks quality, and you approve the layout before anything is cut.
- 05
Installation
Pieces are brought in, dry-fitted, leveled, set and finished, then we walk the result with you.
- 06
Project Coordination
Stoneex Surfaces is your single point of contact for everything stone-related, from slab reservation to install day.
Ready for step one? Tell us about your project
Share photos, rough sizes and the material you like. We will help you take the next step.
